paper shop

英 [ˈpeɪpə ʃɒp] 美 [ˈpeɪpər ʃɑːp]

n.  报刊经销店; 报刊亭



柯林斯词典

  1. 报刊经销店;报刊亭
    A paper shop is a shop that sells newspapers and magazines, and also things such as tobacco, sweets, and cards.

    双语例句

    1. 'Went to the paper shop-but it had blown away'
      要去纸店,结果它被风吹跑了。
    2. This paper introduces the design of a vehicles repair shop circular system.
      本文介绍了一种汽车维修店通告系统的设计与实现。
    3. In this paper, the shop floor scheduling algorithm is studied.
      本文在传统的遗传算法的基础上,对车间调度算法进行了深入的研究。
    4. This paper is a combination of practical, shop online from the students and opportunity faced by students online shop to analyze the risks and difficulties.
      本论文主要是结合实际,从大学生网上开店面临的机遇与大学生网上开店的风险和困境来分析。
    5. Buy up the whole of the paper shop this morning?
      今天早晨是不是打算把店里的报纸都买走?
    6. You can get that paper at your local newsagent's shop.
      你可以在当地的报刊经售处买到那份报纸。
    7. This paper studies the multi-objective flexible job shop scheduling problem in genetic algorithm.
      研究了遗传算法在多目标柔性作业车间调度问题中的应用。
    8. In the paper, aiming at job shop scheduling, a method of work procedure mixed with coding chain is adopts and this method is realized by using Visual C++ 6.0.
      针对车间作业调度问题,采用工序混合编码链的方法,在Visualc++6.0下实现了这一染色体编码算法。
    9. In this paper, equipment hierarchy model in digital manufacturing shop was founded based on the concept of logical equipment and physical equipment;
      文章在提出逻辑设备和物理设备概念的基础上建立了车间设备管理的递阶控制层次模型;
    10. This paper analyses the characteristics and factors of manufacturing shop management comprehensive evaluation, designs an evaluation index system, establishes a fuzzy comprehensive evaluation method and develops an evaluation software.
      分析了制造业企业生产现场管理综合评价的特点和需要考虑的因素,设计了评价指标体系,建立了生产现场管理模糊综合评价方法,开发了评价软件。
    11. This paper first study three stages flexible flow shop scheduling problems: with m_1 identical parallel machines in stage one, a batch processor in stage two, and m_2 identical parallel machines in stage three.
      首次研究了3阶段柔性流水作业问题,其中阶段1由m1台同型机组成,阶段2为一台批处理机,而阶段3由m2台同型机组成。
    12. In this paper a shop production management and control system with the autonomous manufacturing island model is analyzed and discussed for CIMS, including the principle and the component.
      分析、讨论了CIMS环境下,采用独立制造岛生产模式的车间生产管理和控制系统的原理和组成。
    13. This paper introduces the designing process of a car selling shop, discusses the model and material choices.
      本文简述了一个汽车销售店的规划设计过程中,平面功能和立面造型满足使用要求的前提下,对设计选型及材料应用方面的一些优化选取原则。
    14. The paper, introduce completly the connection of several shop scheduling problems in the graph theory view firstly.
      本文首先从图论的角度阐述了几种车间调度之间的关系,描述混合流水车间调度问题。
    15. In this paper, No-wait Flow shop Production Scheduling within Finite Intermediate Storage ( FIS) under uncertainty was considered.
      本文研究了处理时间不确定条件、含零等待模块的在座时间有限型FlowShop生产调度问题。
    16. This paper deals with hybrid flow shop scheduling problem with earliness/ tardines. It is an NP-hard problem.
      讨论了混合FlowShop环境下的提前/滞后调度问题,这是一个NP-难题。
    17. It is hard to get solutions in job shop schedule problem using by single algorithms. This paper proposes a hybrid algorithm for job shop schedule. The ant colony algorithm which plunges the local situation easily is used as a global search algorithm.
      为了解决单一算法求解Jobshop调度问题存在的不足,该文提出了一种混合算法,将蚁群算法用于全局搜索。
    18. This paper extends the methods and conclusions of the paper [ 1] to the ordinary flow shop sequencing schedules.
      本文将文献中的方法和结论推广到一般排序的流水车间作业。
    19. This paper introduces the simulation system in the shop for the manufacturing process and the simulation of the control language used to define the entity's behaviors and the control of its actions.
      介绍了车间生产过程仿真系统及用于定义仿真环境中实体行为的仿真控制语言。
    20. This paper studies fuzzy flow shop scheduling problem which involves both fuzzy processing time and fuzzy due date. Fuzzy processing time is denoted by a triangular fuzzy number and fuzzy due date is denoted by a trapezoid one.
      对同时考虑模糊加工时间和模糊交货期的模糊流水车间调度问题进行了研究,模糊加工时间用三角模糊数来表示,模糊交货期用梯形模糊数来表示。
    21. On the basis of an analysis of the feasibility of China Post to develop online shop business, the paper proposes some countermeasures for development of online shop business.
      在分析中国邮政发展网上商店业务的可行性的基础上,提出了发展网上商店业务的若干对策。
    22. An integrated pattern with distributed CAPP and production scheduling of Autonomous Manufacturing Island is introduced in this paper. This pattern is based on the shop ( island) manufacturing resource availability and real time feedback from shop floor.
      本文提出了一种分布式CAPP和独立制造岛生产作业计划的集成模式.该模式基于车间(制造岛)制造资源的可用性和来自车间现场的实时反馈。
    23. In this paper, the air conditioning design of HERMES duty-free shop is introduced.
      本文介绍了某HERMES专营店的空调设计方法。
    24. This paper deals with the flow shop scheduling problems with processing time dependent on starting time.
      讨论了加工时间依赖开工时间的FlowShop调度问题。
    25. This paper summarizes methods of research on flow shop sequencing problem, constructs an intelligent optimization system with genetic algorithm for flow shop scheduling problem, and deals with structure and work mechanism of this system.
      综述了FlowShop调度问题的研究方法,构造了一个基于遗传算法的智能化调度系统,给出了系统的结构组成及工作机制。
    26. This paper concerns with the dynamic job shop scheduling problem to minimize total weighted tardiness is studied.
      研究工件加权拖期总和最小化的动态Jobshop调度问题。
    27. The paper studies flow shop scheduling problems with finite intermediate storage with different delivery windows under uncertainty.
      本文研究了在处理时间不确定的条件下,带不同交货期窗口的存储时间有限型FlowShop调度问题。
    28. The feasibility tests are given in this paper and the standard job shop scheduling instance is simulated, and the result proves that the hybrid algorithm has feasibility and high efficiency, compared with other algorithms.
      本文通过实验验证了混合算法的可行性,并通过标准的车间调度实例进行仿真实验,实验结果的分析比较(和其他算法进行比较)证明,改进的混合算法不但具有可行性,而且具有高效性。
    29. Satisfaction and trust has a significant impact on customer loyalty and trust has the greatest impact on customer loyalty. Finally, from the reverse logistics services, this paper makes some sugges-tions of B2C Shop about how to improve customer loyalty.
      最后,从逆向物流服务方面,对B2C网店如何提高顾客忠诚提出了几点建议。
    30. The paper makes the simulation experiments for the classic job shop scheduling problems. and implements the simulation system of the job shop scheduling.
      最后,本文针对经典的作业车间调度问题进行了仿真实验,并实现了Job-Shop调度模拟系统。